Those of you who knew me in school or at
IBM or
ISS may be amazed at how I've changed. I'm not referring to physical appearance. I'm talking about my attitude, happiness, outlook on life, health -- that kind of stuff. I've done many things I'm not proud of. I've even been the date from hell at least once. My biggest life-long problem has been controlling my temper and dealing with anger.

While at the
University of Alabama, an ex-girlfriend told me "you sure are an angry young man." That was an eye opener. I struggled to change myself for years but had no success.
Somewhere in the early 2000's I started hanging out with a better crowd. Three men in particular had a great impact on me: Eric Smith, Garry Holton, and Carl Jameson. I met these guys at the
Atlanta Street Baptist Church. They pointed me back to Christ. I turned my anger problem over to God by renewing my dedication to Jesus Christ. Since then life has been fantastic.
I thought life was good before, but I never knew how great it could be. I couldn't see what I was missing. I'm much more easy going now; full of peace. I'm much happier.
ReplyDeleteWhen man is under threat, he will do two possible things: fight or leave. Anger,
therefore, is a natural response when you feel threatened by something or someone. When the cause of fear or threat is eliminated, then the emotion dissipates.atlanta anger management
Teen drug and alcohol abuse is fast becoming a major international issue with more youths falling prey to these addictive substances. One of the major contributing factors to this high rise is the fact that illicit drugs are so easily accessible to young children nowadays.atlanta anger management
ReplyDelete